CASE STUDIES

Offshore 24/7 Energy Matching for District Heating

Jan 13, 2023

Project location

Netherlands

EnergyTag audited

Planned

Temporal matching

15 min

Geographical matching

Country level

Tracking method

Granular Certificates

Share

Project stage

  • Planning

  • Live demo

  • Commercial

Organisations

Temporal matching of offshore wind supply for 22 MW e-boiler for better steam production.
EAC issuing body (CertiQ) works with FlexiDAO, the GC issuer, to avoid double counting.


Key takeaways:

1. Proved the viability of GCs as more granular market instrument.

2. Provided further evidence that a more transparent, time-based certification system can be integrated into the current sustainable energy certification system.


Next steps:

1. Initiative focuses on testing feasibility of Granular Certificates in real-life settings in accordance with EU, Dutch renewable energy certification, and EnergyTag Guidelines.


Link

Project website: Link

Contact: Eloise Moench (e.moench@flexidao.com)